Calculate My Reno All Calculators
Free materials calculator

Concrete Calculator

Enter your slab length, width and depth to get the concrete volume in cubic metres - plus how many 20 kg or 25 kg bags to buy. Works in metres and millimetres, or switch to feet and inches.

Pour sections

01. Sections & shapes

02. Mix & wastage

Calculated requirement
0.63m³ of concrete

Net volume

0.60 m³

Guide & worked example

How this calculator works

Concrete is sold by volume, so the calculator multiplies the three dimensions of your pour, then adds a wastage allowance:

volume = length × width × thickness × wastage

It then divides that volume by the yield of one bag (the figure printed on the bag) to give the number of bags - or leaves it as a cubic-yard or cubic-metre figure to order as ready-mix.

Worked example

This example follows the unit system you pick in the calculator above.

A 3 m × 2 m slab, 100 mm thick, with 5% wastage:

  1. Volume: 3 × 2 × 0.1 = 0.6 m³.
  2. Add 5%: 0.6 × 1.05 = 0.63 m³ to order.
  3. From 20 kg bags (≈ 0.009 m³ each): 0.63 ÷ 0.009 ≈ 70 bags - clearly a ready-mix job.

Bag yields at a glance

This table follows the unit system you pick in the calculator above.

BagYieldBags per cubic metre
20 kg~0.009 m³~108
25 kg~0.0115 m³~87

Tips for an accurate order

  • Measure the form, not the ground - the slab is only as deep as your formwork allows.
  • For footings and trench fill, allow 10% over-dig: trenches are rarely cut to an exact width.
  • Order ready-mix slightly generous; a barrow-load short means a visible cold joint.
  • For circular pads or posts, work out the area separately (π × radius²) and enter it as length × width that gives the same area.

Frequently asked questions

01

How much concrete do I need for a 3 x 3 m slab?

A 3 m × 3 m slab at 100 mm thick is about 0.9 m³ of concrete before wastage. That is roughly 100 × 20 kg bags, so at that size it is far easier and cheaper to order ready-mix. Enter your exact dimensions and thickness above for the precise figure.

02

How many bags of concrete make a cubic metre?

A cubic metre is about 108 × 20 kg bags or 87 × 25 kg bags, because a 20 kg bag yields roughly 0.009 m³. Once you are past about a third of a cubic metre, ready-mix is usually cheaper and faster than bags.

03

How thick should a concrete slab be?

A 100 mm slab is standard for patios, shed bases and footpaths. Use 125–150 mm for driveways and anything carrying vehicles, over a compacted sub-base. Footings are deeper still. Set your thickness in the calculator to match the job.

04

How much extra concrete should I order for wastage?

Add 5% for a clean formed slab and 10% for footings or an uneven sub-base where concrete slumps into dips and over-dig. Running short mid-pour means a cold joint, so it is always better to round up - the calculator does this for you.

05

Should I use bags or ready-mix concrete?

Bags suit small jobs up to roughly a third of a cubic metre - posts, small pads, repairs - where mixing by hand or in a small mixer is manageable. For larger slabs and driveways, ordering ready-mix by the cubic metre is cheaper, faster and gives a more consistent mix. Switch the supply option above to compare.

Related guides